My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />E <br />Date of Testing/Servicing: <br />I �i IIIIIIIIIIII I � I 1111111111111 11111111111 � � �! I ! 111 � 1111 <br />11'r MM OF-vlM MT 4 11 1 1 111111 <br />ComDfete the followine checklist: <br />- In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />PUMI <br />Comalite the following checklist <br />Has all unma wiring been inspected for proper entry and termination, including testing for ground fmflts? <br />Rt <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />WON <br />(Check all that apply) Simulated leak rate: <br />ULMISM! <br />Was accuracy of system water level readings tested? <br />Notes: 1. R&quired for equipment start-up certification and annual certification. <br />7VVer—e all items on the equipment inainifitcturer's maintenance checklist completed? <br />- In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />PUMI <br />Comalite the following checklist <br />In the Section H, below, describe how and when these deficiencies were or wiH be correctedL <br />H. Comments: <br />Page 3 of 3 03/01 <br />070r �Cqmlpm ammal equip -T-1 TM To111IFT, on, M-9MWIT 18 11 IFT7 MiTTMETTZ - <br />'p'.h.'; <br />(Check all that apply) Simulated leak rate: <br />Notes: 1. R&quired for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD stm-up. <br />Was the testing apparatus properly calibrated? <br />For mechanical LlDs, does the LLD restrict product flow ff it detects a leak? <br />4 <br />LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0717 M T M7J 'P-tT1MrUf-h:O Mollwutq; SySWAL iW 0"j'-nU1*L <br />R:, disconnectI <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or &ds a test <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />In the Section H, below, describe how and when these deficiencies were or wiH be correctedL <br />H. Comments: <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.