My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
joint <br />which <br />.f <br />promotes <br />fast, posi- <br />tive make- <br />up and pre- <br />vents "back- <br />out" problems <br />during cure time. <br />These features assist <br />the installer and assure <br />economical installation. <br />• Reliability - Smith Fiber- <br />glass Products fiberglass pip- <br />ing is designed and manufactured to <br />meet the requirements of governmen- <br />tal environmental regulations, in- <br />cluding EPA. Fiberglass piping differs <br />from other products which are <br />1?�a�}.iiJ'i�:_'{.�R"�'.::•:;+faSlC+ti.=a)��33�+"?e�C �=", :s-_�5iy�?� `;: -`": <br />��• `•! ' � ' dam. �, � S' ^' '' ^ �� y�..."°e <br />�:"�,. .QCT .a .. - t •a'. •. ya _• I� <br />,s <br />designed for easy replacement in the <br />event of failure. <br />REFER TO BULLETIN 82150 for <br />dimensions of available UL/ULC <br />Listed RED THREAD IIA product <br />and containment fittings. <br />Easy, Economical Installation <br />The exclusive T.A.B. joint is factory - <br />installed on product piping. Spigots <br />and bonded -on coupling ends are <br />threaded with special profile double - <br />lead threads. The standard joining <br />procedure for field -made epoxy bonds <br />is achieved by the mechanical locking <br />action of matching bell and spigot <br />tapered angles. Compatible adhesives <br />from Smith Fiberglass Products are <br />used to bond the piping system. T�- <br />components needed to make a bor. <br />along with a detailed instruction she= <br />are included with each adhesive kit. <br />When RED THREAD IIA produ <br />pipe is cut to length on the jobsit. <br />the cut end must be retapered. <br />tapering tool, available from Smit <br />Fiberglass Products (Bulletin `c <br />F6600), quickly applies the prope <br />matching taper — similar to a pent <br />sharpener. Plain, unthreaded fieic <br />made tapers can be joined wit <br />factory -installed T.R.B. joint couple <br />ends. Either T.A.B. spigots or fielc <br />made tapers may be joined with belle <br />fittings. <br />When connecting containment pips <br />and fittings, plain ends of the contain <br />ment pipe are machined or thoroughk <br />sanded to accept the two-piece UL <br />ULC Listed containment fitting. Match- <br />ing adhesives are used to bond the <br />system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.