My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page �— of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> E� �'� <br /> , Piping Run# 1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 250' 250' <br /> Product Stored: Dyed Diesel Dyed Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:30 8:30 <br /> Initial Reading;(RI): 5 PSI 5 PSI <br /> Test End Time: 9:30 9:30 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 1 Hour 1 Hour 30 min 30 min <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 0 drop 0 d0 drop 0 dro <br /> Criteria: drop P <br /> Test Result: x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.