Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1 Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 48" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 26" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 3299 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Line 28" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both N/A <br /> product and water)?* <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe N/A <br /> shutdown?` <br /> Was fail-safe verified to be N/A <br /> operational?* <br /> Wait time between applying water 5 Minutes <br /> and starting test: <br /> Test Start Time: 10:00 <br /> Initial Reading(RT): .001 <br /> Test End Time: 10:30 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Test Result: X Pzts's` CI Fail L7 Pass G Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA ❑Yes ❑No 0 NA ❑Yes 0 No ❑NA 0 Yes ❑No 0 NA <br /> Was sensor properly replaced and X Yes 0 No ❑NA ❑Yes ❑No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Tank System is for Emergency Generators and Boilers. <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />