Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC# UDC# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown? <br /> Was fail-safe verified to be <br /> operational?* <br /> Wait time between applying <br /> water and starting test <br /> Test Start Time: <br /> Initial Reading (RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading RF-Ri : <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: fi Pas V ❑Fail, 0 Pass i' 0 Fail 0 Pass Cl Fail= p PAss ! 0 Pail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and LL]Yes ❑ <br /> verified functional after testin ? No 11NA LJ Yes ❑No ❑NA IJ Yes ❑No ElNA 1j Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> No UDC's. <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />