Laserfiche WebLink
PRODUCT PIPING SUMP TESTING <br />Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: O Pressure O Vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: INCON TS -STS (Electronic Sump Test System) <br />Descrintion Tank #1 Tank 10 Tank ii -A <br />Tank product <br />Gasoline - 87 <br />Gasoline - 91 <br />Diesel <br />Sump material <br />FRP <br />FRP <br />FRP <br />Sump diameter (inches) <br />42 <br />42 <br />42 <br />Sump depth (inches) <br />50 <br />54 <br />55 <br />Height from tank top to highest <br />piping penetration (inches) <br />22 <br />24 <br />14 <br />Height from tank top to lowest <br />electrical penetration (inches) <br />15 <br />15 <br />16 <br />Method of sump attachment to tank <br />Collar <br />Collar <br />Collar <br />Condition of sump prior to testing <br />Dry <br />Dry <br />Dry <br />Portion of sump tested <br />Entire <br />Entire <br />Entire <br />Is system programmed for fail-safe operation? <br />Unknown <br />Unknown <br />Unknown <br />Was fail-safe verified to be operational? <br />No <br />No <br />No <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced after testing? <br />Yes <br />Yes <br />Yes <br />Depth of water level from tank top (inches) <br />24 <br />26 <br />26 <br />Wait time for water level to stabilize (hr:min) <br />0:10 <br />0:10 <br />0:10 <br />Test start time <br />12:07 PM <br />11:49 AM <br />11:49 AM <br />Initial Probe Reading <br />5.8591 <br />6.0070 <br />3.3290 <br />Test end time <br />12:22 PM <br />12:04 PM <br />12:04 PM <br />Final Probe Reading <br />5.8582 <br />6.0066 <br />3.3291 <br />Test duration (hr:min) <br />0:15 <br />0:15 <br />0:15 <br />Change in water level (t 0.0000 inches) <br />-0.0009 <br />-0.0004 <br />0.0001 <br />Pass/Fail threshold (±0.0020 inches /'4 Hr.) <br />0.0020 <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />0 2006 Walton Engineering, Inc. <br />