Laserfiche WebLink
t rIFIED PROGRAIM CONSOLIDATED FOR <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 2) <br />440.1 <br />TYPE OF ACTION ® 1. NEW PIAN ® 2. CHANGE OF INFORMATION <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALI. UST's AT Tt IN FACILITY. 490-2 <br />{Check one item only) ❑ 2. THIS ES P LAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />1 <br />BUSINESS NAEVIE (.Sante as Facility r\rmne or• DRB 4) 3 <br />Flyers #487 <br />BUSINESS SITE ADDRESS 103. <br />983 Moffat Blvd. <br />CITY 104. <br />Manteca <br />11. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the ecluiprnent inanafacnlrers' instnictions, or annually, whichever is more frequent. Such wort: must be pSEfo pcd by qualified personnel.,123 CCR §2632, 2631, 2635, 2641) <br />490.31 <br />MONITORING EQUIPNIF.\T IS SERVICED ® 1. ANNUALLY C199" an IER (Specify): 490-3b <br />111, MONITORING LOCATIONS <br />4190-4 <br />❑ 1. NEW SITE PLOT PIAN/MAP SUBMITTED WITH THIS PLAN ® 2. SITE PLOT PLAN/NIAP PREVIOUSLY SUBMITTED (23 CCR §2632.2634) <br />[V. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS; (Check <br />j <br />® L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) Olt SECONDARY CONTAINMENT VAULT(S) 4915. <br />WITH AUDIBLE AND VISUAL ALARMS. 123 CCR §2632,2634] <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 190-6. <br />PANEL MANUFACTURER: Veeder Root ago-�. MODEL #: TLS -350 490.5. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL #(S): 0794380-420 4190.10 <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO NIONITOR SINGLE WAIL TANis(S).123 CCR §2643) 4190-11 <br />PANES, NIANUFACTURER: 411-12. MODEL #: 490.13. <br />490"t4. MODEL fl(S): 490-15 <br />IN -TANK PROBE MANUFACTURER: 490-14, <br />LEAK TEST FREQUENCY: ❑ a" CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490'16. <br />❑ d. MONTHLY ❑ e. OTHER (Speedy): 49047. <br />490.15. <br />PROGRAMIOED TESTS: ❑ 1.0.1 g.p.h. El b. 0.2 g.p.h. [I c. OTHER (Speclry): 490-19. <br />_- -. --- 490-20. <br />❑ 3. MONTHLY STA-riSTICAL INVENTORY RECONCILIATION 123 CCR §2646.II 490.21 <br />---- <br />..........___._.- _._ ._ <br />b. 60 HOURS 490-21 <br />❑ 4. WEEKLY LMANUAL TANK GAUGING (MTG)123CCR§2645] TES'T'ING PERIOD: C1 a.36HOURS Elx9 0.22:........_ <br />❑ 5. TANK INTEGRITY TESTING PER (23 CCR §264311 <br />aso•21. <br />TEST FREQUENCY: ❑ a. ANNUALLY [Ib. BIENNIALLY ®-c. O'fIIER (Specify):- __...__ 49125__ <br />_. _ _ <br />_..__. 49U•26. <br />❑ 99. OTHER (Specify): 490-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S� (CheckalJ <br />that a ) <br />® 1. CONTINUOUS MONITORING OF PIPEIPIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 4x1 -2s <br />(zs ccR SFCONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM '90.29. <br />§?6361 <br />PANEL A•IAINUI-ACTURF,R: Veeder Root 490-30. MODEL#: TLS -360 490-31. <br />LEAK SENSOR MANUFACTURER: Veoder Root 490.32. MODEL. #(S): 0794380-208 490-33 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 19131 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-35- <br />® 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36 <br />PRODUCT FLOW WHEN A LEAK IS DFTFCTED. (23 CCR§2636) <br />S 490.35. <br />MLLD A,fANUFAC'I'URER(S): V1porieSS x90.37. MODEL # ('); 99L.D2000 <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. 123 CCR§26361 490"341. <br />F <br />ELLD MANUFACTURER(S); 190-40. MODEL #(S): 190.41 <br />PROGRAMNIFI) IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 493-42. <br />ELLD DETECTION OF A PIPING LEAKTRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO 490'43 <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHU'T'DOWN. ❑ a, YES [:1 b. NO 490.44. <br />. <br />490.15. <br />❑ 4. PII'F INTEGRITY TESTING. <br />_ p 190•46. <br />TESTESTFREFREQUENCY:ElE]1 a. ANNUALLY ❑ b. EVERY 3 YEARS c. OTHER S eci�) 190_17__--.... <br />490-13 <br />❑ 5. VISUAL PIPE MONITORING. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ c. \TN. MONTHLY S F.ACH TI,%IE SYSTEM OPF1tATED" 49049. <br />Allowed for monitoring ofunb cried emergency generator fuel piping only per HSC §2s281.5(bx3} _ _ _ <br />490.50 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. 123 CCR §2636(x)(3}1 - <br />__._._. _- _ �.___._ <br />--_.._...__.-._.___._ �.._.-_ <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6"7 IS CONNECTED TO THE TANK SYSTEM. 490-S1. <br />❑ 99.0'1'1 IFR (Specify) 49as3. <br />uPCF US -r -D (12/2007) -114 3tiivmunidocs.org <br />