Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sogov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Faculty Arco Mossdale Facility 444 West Mossdale Road, Lathrop Inspection Mar 25, 2013 <br />Name: Address: p Date: <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />UST Inspection: Routine & Annual Monitoring System Certification <br />Testing was incompletely performed on March 25, 2013. Check list provided only. <br />Written report & photos provided on March 27, 2012. <br />Addendum 04/04/13- removing violation 999. HSC 25185(c)(3) <br />104. Financial responsibility documents have not been submitted to EHD for 2011, 2012 and 2013 year. <br />Current financial responsibility documents are required to be submitted annually via fax or postal <br />mail. Complete and submit a copy of the financial responsibility documents for 2013 year to EHD within <br />30 days of this report. Submit an explanation how the operator/ owner submits this documents in a <br />timely manner to EHD annually. <br />- Received copy of 2013 on site. <br />108. Secondary containment testing was last performed on May 28, 2009 and was due by May 28, <br />2012. Testing has not been completed and is 10 months past due. Designated operator Karen Arnaiz <br />documented that secondary containment "Items Requiring Follow-up Actions: Have SB -989 testing <br />performed" on every monthly report since August 2012 to present. It appears that the designated <br />operator drop off the reports to the site but no facility employees are reviewing the documents. <br />Secondary containment testing is required once every 36 months. Immediately schedule this test and <br />provide 48 hours notification to EHD. <br />- Phone call & fax from Afforda-test stated test scheduled for March 28, 2013. <br />206. The designated operator employee training for Sunny Singh, "Jasper", Sandra Perkins and Jagjit <br />Singh was last conducted May 25, 2011. The next annual training was due by May 2012. Instead, the <br />designated operator Karen Arnaiz did not conduct the training until November 8, 2012, approximately six <br />months past due. Ensure next designated operator employee training is conducted on an annual basis. <br />Explain how employee training will be conducted in a timely manner. <br />109. Annual monitoring system certification, leak detector testing, and spill container testing was <br />performed on July 12, 2012 and a test report has not ever been submitted to the EHD. A copy of the <br />test report must be submitted within 30 days of the tests. Immediately submit a copy of the test report to <br />the EHD. - Corrected on site. A copy was received. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT END'S CURRENT HOURLY RATE. <br />Inspector: Received By: Title: _7_1 <br />FHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPOR' <br />r <br />