My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:35:02 AM
Creation date
6/3/2020 9:51:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231692_444 W MOSSDALE_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 19 10 09:37a Reliable Petroleum <br />�I <br />20r953 p.7 <br />Vaporless Manufacturing, Mo. <br />Quality Petroleum Equipment <br />Solutions for Over 20 Years <br />Installation of the 99 LD -2000,& 99 LD -2200 <br />Leak Detectors <br />October Ist, 2006 <br />Before Installation: <br />1. If the lime system is new, before installing a leak detector, purge the system of anv air <br />2. Turn off the submersible pump breaker and install the VMI LDT-890 beak Detector <br />Tester at the impact valve of the farthest dispenser. Following directions of the LDT- <br />890 Test Protocol. Determine bleed -back (air in line) - should be 400 ml or less, paimp <br />pressure (should be 24-50 psi), line pressure with pump Off (establish pump pressure <br />relief psi). <br />3. Before replacing an existing leak detector because of 1) Failure to open 2) Leak <br />detector is slotif to open, determination should be made as to; Is this line system tight'.' <br />Is thermal contraction slowing down the opening time of the leak detector? A leak <br />below 3 gph cQ 18 psi will slow down the opening time of a leak detector. Thermal <br />contraction will also slow down opening time of a leak detector. Should a precision <br />line test be conducted to ensure line integrity? A line test should also be conducted <br />where installing a leak detector in the system for the first time. <br />To Install the Leak Detector: <br />1. Shut off the power to the submersible pump at the breaker box. <br />2. Open nozzle at dispenser to relieve line pressure. <br />3. Shut ball vahre at discharge of turbine. <br />4. Remove the existing leak detector or 2 -inch pipe plug in the submersible pump or <br />adapter tee. <br />5. Apply a "UL Classified" (QLSR) pipe joint sealing compound (for use with petroleum <br />products) to all threads before final assembly. (Before screwing the leak detector into <br />the pump or the adapter tee. Tighten the leak detector down firmly to make sure <br />there is no leakage. (Caution - do not over -tighten the leak detector. Over -tightening <br />could cause undine stress on the pump or the leak detector.) <br />Vaporless N-tanufacturing, Inc, <br />8700 bast Lona iklesa Drive. Prescott Valley, Arizona 86314 <br />800-367-0185 928-775-514) Fax: 928-775-5309 <br />Email: vmi( EW—WL s4vanorless.cor <br />
The URL can be used to link to this page
Your browser does not support the video tag.