My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:35:02 AM
Creation date
6/3/2020 9:51:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231692_444 W MOSSDALE_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 19 10 09:38a Reliable Petroleum <br />209 45-8953 p.8 <br />Installation of the LD -200 & LD -2200 <br />Leak Detectors <br />Page <br />6. Apply pipe sealant to the threads of the 90 degree compression fitting and install into <br />the top of the leak detector. Tighten firmly, but do not over -tighten. <br />7. Remove the V4" pipe plug from the tank test port on the submersible pump. Install <br />the straight compression fitting into this port. <br />S. Install the copper tube into the compression fittings. Tighten firmly, but da aot over - <br />tighten. <br />9. Turn on submersible pump purser. <br />14. Turn pump on at dispenser. <br />leaks. Check tightness of Ieak detector to assure there are no <br />11. Slotivly open iball valve at discharge of turbine. <br />12. 'Test leak detector in the system as per the LZ>T-890 Installulipte p elation protaca+L <br />If a VING. leak detector fails to detect a leak in the line system, please follow the <br />included with your leak de <br />instructions on Ad'ustrnent o �I.�eak Detector dated March 28`'', 2005. This is <br />wwttector or can be located on our website at <br />�.vcx o�less corn under Technical llulletin�- .Teclanical �ttlletiir 032805Adjustment of i !Vr Leak l?etectoi <br />Vaporless Maouracturiing, lac. <br />8700 East Long ldlesa Drive, Prescott Vaiiey. Ari7onn 86314 <br />800-347-0185 928-775-5191 Fax: 925-775-5309 <br />Email: vFW vagorfess.coan Website: &Mmy 00riess Com <br />
The URL can be used to link to this page
Your browser does not support the video tag.