My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:59:27 AM
Creation date
6/3/2020 9:51:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No.P 3424t Attestation No.P 3423 p <br /> RIP <br /> C> Fz0 <br /> Juan Jauregui .` .� Jessie D.Andreda <br /> u` !i <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase Y by OPW,Inc Attended Installation Training for EVR Phase I by OPW,Inc <br /> By:Tom Spindle On:9/26/2006 ' By:Tom Spindle On:9/26/2006 <br /> e <br /> In: Exp Date:9/26/2008 i, In: Exp Date:9/26/2008 <br /> comphstian ofdrs training course does not mate a warranty orguarrnty bYOPW m'your in�lkbon cornp/etron oftnistraining course does snot create a warrantyorguananty by OPW of your innsG//abon y, <br /> a /amaintenan[e.ofralztes,:vaAorrecoyeryswem and EK:PHASEISYste,ra Thistraining i arM/ormaffit- >ceofrwa/es,valbrmcowal'systemsandEm PHASEIsy hystrai m <br /> course does not eliminate the need to stricdYadhere to manufacturer mb*u vm andprocedwaT when course does tW e/irmnate the meed toStrictly adhere to manufacture,irstructiors andPmcedures when ' <br /> instating and`neiitaining ndules;vapor recovery systems and EVR PHASEISys7eirs.AN noales instaNirrg andnain(ainirg nursa'es,vapor rxoverysysterrsandEVR PHA ISystem.A//naa/eg <br /> vapor remverysystem and EVR PHASEI Systems must beGslalled and maintained in accordance wrM vapormoverysystems VR ardEPHASEI Systerrg mrstbe ir6wwand maintainedin accordance with <br /> manufactuierinsmctorsand procedures. <br /> i <br /> _. Attestation No.P 3426 <br /> Attestation No.P 3425 <br /> . .....�+ Gerardo Guzman Jr. David Delgado <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc. Attended Installation Training for EVR Phase I by OPW,Inc <br /> By:Tom Spindle On:9/26/2006 By.Tom Spindle On:9/26/2006 <br /> In: Exp Date:9/26/2008 <br /> Inc Exp Date:9/26/2008 <br /> cogo/e m afthis baln/ag course does not create a warranty orguarenty bYOPW of your insb/kaon <br /> GmnpleG'on oohs training course does not creole a warrantyaguarantybl'OPW dym+rr ireaalkton �, aid/ormaim�ance rroals,vapor recoverys7g'tems and EVR PHASfI sy�ems. 17ris trainm9 <br /> and/ormiritwance ofrrordes,vapormmverysystens and EVR PHASEIsysYe»x Thisbanuig ,j <br /> course dbes,natdiminate:the need to course?toes not el/m/natetbe nr�to sinalyadhere:to manufachrrerinsbuctions and proredor�when <br /> strictly inanufacture,mtnrctiora and procedirw when instaNing and nwintaimng maks;:.vapor recovery systems and EVR PHASE/Syste�rs.AI/noa/es, <br /> irsbNing andrrarntainirgnaa/GS;s9par reroverysystems arrdEVR.Pi1A.sElSysferng A/fnnomes, ��r wry,yyy� and EVR'PHASEI Sy&ww must be irstatled and maintamd in accordance wKh <br /> vapor recoverysyslYms and EVR I HASEI Systems must be insbNed and mwntained in a¢ordance with 'e'vacture-inyymctions and Procadures• <br /> rranwkivre-ms6ictons and pmcedi es. ` _ <br /> i <br /> Attestation No.P 3428 Attestation No.P 3427 <br /> • •• Raymond Ochog Greg Copp }; <br /> i <br /> Walton Engineering Inc. <br /> Walton Engineering Inc, <br /> Attended Installation Training for EVR Phase I by OPW,Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc <br /> By:Tom Spindle By:Tom Spindle On:9/26/2006 <br /> On:9/26/2006 <br /> In: Exp Date:9/26/2008 In: Exp Date:9/26/2008 <br /> c—Atb i ofths training course daps not create a warranty orguaranty by oPW of your rosea//a[non <br /> Completion ofths training course does not create a wamdntyorguarantyby oPW of your insta//anonand/ornaintenanre o noz*s vaporremvayswierms and EVR RmsEIsystenm fits training <br /> and/olrraGrtanance nfrroa/es vapnrrecavery.systevnsard EW PHASElsysten 7Gis.t2ining course das fW eliminate the need to sbtcttyadhere to manufacturer Gstrudions abepmcedures when ! <br /> Course dors rad edimirate the need to sbiKfyadhere to manufadunerirsbvclias and procedures wheny installing and maintains g noa/ vapor recoveysys[ems and EW P//ASEI Systems.A/l nozzles .i <br /> irstagirng and rraintairargnrozzks,vapor recovery systems andEVR PHASEISystvrs.A//nosey <br /> vapor n m wysystems aid EVR PHA SEI Systems must be installed and maintained in accordance wrath <br /> vapornecoverysystems and EVR P/ir15E1 Systems mustbe innsb//ed and maintained in accdrdaxe month manufacturer instructors and p ocedufm <br /> manufacbrrer instructions andprocedures. l <br /> - Attestation No.P 3419 Attestation No.P 3418 <br /> �... Andres Morales �� Isaac Diaz <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc. Attended Installation Training for EVR Phase I by OPW,Inc <br /> By:Tom Spindle On:9/26/2006 By:Tom Spindle On:9/26/2006 <br /> Exp Date:9/26/2008 In: Exp Date:9/26/2008 <br /> In: } <br /> ComMetron of thti training course does not mak a wamarrty aguaranty by OPW oeyvur iiillation cornpletron ofths training corase does race mate a warranty urguaanty by OPW of yorr insta/kbon - <br /> and/orma/ntenarceornozdg;vapuxreWM%Fy!sterns <br /> and EVR PHASEisysteim Thstraining and/cemawawiceoIrr es,.vaporrem�rYSYstems ard.ElrR PHASEI sYsterrx This training G <br /> course dors not eliminate the creed to strdyadfbee to manful rrerwsbt ct/ore andprocedtrnes when course dam not eliminate the need to s&kvyadhere toromanufaaWer mfticbas and procedures when <br /> rnsfalfi�andmamtainirg noa/es vapor r�overysriYemsandEVR PHASEISystems.ANnamles inste/Nng andmaintaGtirg nozd�vapor neroveysystemsand EVR PHASE7$sYrms Al/noa/es, <br /> vapor <br /> vapor recoverysistenrts'andEVKPHASEISystems mostbe/rsb/kd and mamiained k a¢nrdame wrM nranufau:Wn�innstrucdbnsandpnxedures.S mist be irsbNedand rnaintairredin accordance wdh <br /> manufactwer mstrwhons and procedures. , <br /> Attestation No.P 3421 Attestation No.P 3420 <br /> ... Jimmy Hamblen Javier Melendrez <br /> Walton Engineering Ina Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc. l Attended Installation Training for EVR Phase I by OPW,Inc. <br /> By:Tom Spindle On:9/26/2006 By:Tom Spindle On:9/26/2006 <br /> In: Exp Date:9/26/2008 i In: Exp Date:9/26/2008 <br /> completion ofths training mase dans not mate a warranty arguaranty by tWW oryour irstatatton I tbmpktrar ofths training course does cot create a warrantyorguaranty by OPW of your/rn-a!lador <br /> anoornextermrceo(W-fes vapor MID erysystWts and EVRPHASEIsystenm This trainiig and/amalnte WCe ofrrorsles,vaporrecvvarysysrims and EVR PH45E7.systems: Thlstramrrg . <br /> toase Oars not etminate flee need to 5&&&adhere rranufaetuner asbucb'ons and procedures when cruse dc�nmol elm/nate ore n eed toArxoadiwe to manabdbrer iisbuctims and pnomdons when <br /> insb/Nrg and rw ntainAv nom sopor remvaysysterrs am`EVR PHASFISys1e AN nooks, y f irstaHrg andmaintainirq no0j-S,repor r�eysysltms and'EVR PHASPISA1eM.A/l nates, <br /> and EVR PHASEI Systems'must be installed and marntaixd in accordance with vapor remverysys'tems and EVR l msFr SysAws must be installed and maintairned in auxordance with <br /> vapor remverysntems manufacWrer immichons and piocedurm <br /> manufactrrner inftructron5 and procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.