My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 8:59:27 AM
Creation date
6/3/2020 9:51:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attestation No.P 3416' , Attestation No.P 3417 <br /> K.C.Bruce <br /> ¢' •� Michael Buttess <br /> Walton Engineering Inc. ; Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc r` <br /> j 'Y Attended Installation Training for EVR Phase I by OPW,Inc. y' <br /> By:Tom Spindle F By:Tom Spindle . <br /> On:9/26/2006 <br /> y p On:9/26/2006 1 <br /> In: Exp Date 9/26/2008 In: Exp Date:9/26/2008 <br /> Comp/efiar ofthis training course does notaeate a warran - I Completion ofthB.ha ning course does notowte a warranty a9uaranty by OPW ofyour insfa/iabon <br /> tY. 9uaranfY by OPW�Yonnri25Ya/lation and/ormaWeianm.afranles vaV0-=0Wayys3SfBn3S and EW PHASEfsysfems. fiabaning <br /> and/ormai twance orrwa/es,wpm mwl erysysfems and EVR MASEISy14eins Thg bowing course does rat eliminate the creed to sbict/yadhere to rranufadurer instructions andproxd-uses whencourse does rWeh1WAYi'e <br /> insta/1 and ma i noa/e�vapor systems arW a 'nb a } -porrrg��syslems and EVR PH4SEt SWtemsinstalleda wfained in a¢adance wdh '. <br /> srinctlyadheve to manafnd EM PHASIFISystains.AffnamW4 <br /> aaurerirrstructansandoCedkffes <br /> vaporrnroverysys[ams aadEVR PHASE IS _ ._ _.....__. ij <br /> marnifactrirer instructors and piatedms. ,_ <br /> Attestation No.P 3414 <br /> p ; Attestation No P 3415 <br /> . } Luther Shaw <br /> A=W= Kevin Graf <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc. Attended Installation Training for EVR Phase I by OPW,Inc <br /> 14 By:Tom Spindle On:9/26/2006 By:Tom Spindle <br /> On:9/26/2006 <br /> In: Exp Date:9/26/2008 In: Exp Date:9!26/2008 <br /> CwnPietanr ofthB trammg course does not create a warranty wguaranty by opW of your installation i <br /> arrd/armaintmiaam ofno�e5,vaparnixoverysWers and EPR PHASEI systeiix This training ComMefion ofthis training course does not create a warranty wguarantybYOPWafyrour irs'ra//ation <br /> j <br /> course does rr�efiminate Me need.to sine-yadhem to manufacturerirtsbucdores and procedures when � arm/ormaiw�vrance of names,vaoorremverysys�and EVR PHASEI;systems. This training <br /> insta//ing ardmaintaming nazles vapor reroveysystvm andEm PHASErsystwm Al/naffs, came does not eliminate the need to s6fdtyadhere to manufachrrerirsbucb'ons andpiocedureg when ^� <br /> insta//ingardirmintawagnozee�vapor mwverysysterrs aid EVR PHA5EI5 <br /> vaporfactw erysystems aMEW dprocedures S[erns mruY be irsb/kd and awn tamed in a¢ordance widh tai ens.A//noffies, <br /> manufactrnner instrucbvs andpmcedures. vapwremverysyslems and EVR.PHASEI S)5(e»s mast be irsbaedard maintairhed in axonlanxk wrth <br /> mamdacbrrer Hufruchons and pmcedures. <br /> • Attestation No.P 3412 Attestation No.P 3413 <br /> Mauricio Miranda Larry L.LeDuff <br /> Walton Engineering Inc. Walton Engineering Inc. j <br /> Attended Installation Training for EVR Phase I by OPW,Inc. Attended Installation Training for EVR Phase I by OPW,Inc <br /> t <br /> By:Tom Spindle On:9/26/2006 By:Tom Spindle On:9/26/2006 <br /> 3 <br /> In: Exp Date:9/26/2008 In: Exp Date:9/26/2008 <br /> Completion ofthis training course does not create a warranty wgueranty by OPW of your instal/a&'; Comp/etion ofths[raining mm�does rat orale a warranty wguaranty bYOPWof yuan inspi/ation is <br /> and/wmaintmance ofnozzes,vaporremverysysterrs and EVR PHAs'Eisysstem nstnaniig ard/wmaintanance ofnrva/a,vapwnemverysystems and EVR PHASEtsys[ems Thisbafning <br /> course does rote/imina�the iheed mstricttyadhere to manufacturerinstructiom andpmaNures when cowse does nor eliminates the need to sbictfyadhere to manufacture-irgbuGiom and procedures when <br /> insfa/fwgardmai towirgnoaies,vapor 2eoverysmyns ardEVR PHASEISy;tt'✓w Aflnones, irsta/ting ardmaintaini�naaJe�vapor re:overysy5femsa�EVR PflA.SEISysfens.A//noa/es <br /> vaporremverysy5t&m and EW PHASE1 S)stems must be Installed and maintained in amwdance with vaporremverysysferrs and EPR PHASEI Sys&ms cornet be irsfal/ed and mainlabred in a¢adance with <br /> manufactmerinsfruchons andpmosdures mamActwer instructions acid-prdredures. <br /> Attestation No.P 3410 Attestation No.P 3411 <br /> • Richard Walton Ryan Green <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc. " Attended Installation Training for EVR Phase I by OPW,Inc. <br /> i <br /> By:Tom Spindle On:9/26/2006 By.Tom Spindle On:9/26/2006 <br /> � t <br /> In: Exp Date:9/26/2008 In: Exp Date:9/26/2008 <br /> Compietrm ofthis training course does not aeate a warranty orguaranty by OPW ofiour installation ComPletrm ofths lraimng course Ones not creole a warranty or guaranty by OPW be your irs[a//a[ion <br /> aid/wmaintename dfnoales,vapor and EVR PHASEtsystems Thisbaining abe/wr�intmance ofra ;vaoorremverysystarsand EVR PHASElsyStenrs fiB trainirrg <br /> i I course does 1w eliminate are creed to ancby adhere to manufatturerinstructrms and procedures when <br /> 'r course does not eliminate the need to S&dy adhere to manufacturer instructions and proce9urm when i <br /> installing andmawraning noafes,torpor reroverysisoms and EVR PHASEISystems.Alf noz?ks, ' i2sb//i�ardmainfainng..noales,vapw rEroverysysffiirsardEVR PHASEISys�ns.A//noa/es, <br /> !. vapor recoverysystaris and EW PHASEI Systems-must be instated and maintained in aaordanue with yaporreroverysy5fernsand EVR PHASEI Systems must be installed and maintained w a¢wdaxe with <br /> manufaCtrirer instructions and procedure. manufacNrer instructions and procedures. <br /> Attestation No.P 3432 Attestation No. P 3433 <br /> � s <br /> i } Michel Lawrence Bruce Stewart <br /> Walton Engineering Inc. ` Walton Engineering Inc, <br /> Attended Installation Training for EVR Phase I by OPW,Inc. !Attended Installation Training for EVR Phase I by OPW,Inc. <br /> By:Tom Spindle On:9/26/2006 By:Tom Spindle <br /> On:9/26/2006 <br /> In: Exp Date:9/26/2008 i In: Exp Date:9/26/2008 <br /> Completion ofth/s training course does not awM a warrantywguaraMy by OPW of year installation Cmwftm ofbns training course dos not create a warrantywgu"ntyby oPW of your insfalabm <br /> and/wmaintenance drazzles,vaporremmysystems aid EPR M44SZF1*--[ems 77istraining and/mrrmintenance ofnmzs,vaporremwrysystans and EPR PHASEI <br /> course does not eliminate the need m sbrctfyadbere to manufacturer insbudiom and procedures when cowse abs not eliminate bre tosbidfyadhere m mandadu iebuctios aid training <br /> instalOng and maintawing nomm vapor reeoverysysdms and EVR PHASPI Sysiems.All noales, instaaing aid mawtawing nate&vapesrreovetysyshsrs and EVR PHASFI System pmadrrra when <br /> .All noa/� <br /> vapor necoverysystems aM EVR PHASEI Systems must be installed and maintained in accordance with vaparreMverysWtems and EVR PHASPI Systems must be poria/!ed and maintained in accordance with <br /> manufacturer instructions and procedures. manufacturer instructions and procedure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.