Laserfiche WebLink
Attestation No.P 3429 Attestation No.P 3422 <br /> I;: - <br /> , �,... Scott Jessiman Juan Delgabo <br /> Walton Engineering Inc. 1 I *alton Engineering Inc. i <br /> i <br /> Attended Installation Training for EVR Phase i by OPW,Inc j Attended Installation Training for EVR Phase I by OPW,Inc. ;! <br /> 1. <br /> By:Tom Spindle On:9/26/2006 ( By:Tom Spindle On:9/26/2006 <br /> In: Exp Date:912612008 In: Exp bate:9/26/2008 <br /> f <br /> completion orths baiting course does not create a-warranty or guaranty by OPW of yon ut to/!anon - % �i aLthis.tramug inure.does not create a warranty argua2nty by o?W of year insta labon <br /> and/or mair#enana noes,vaporremue0'.sY erm and EVR HlA.SEIsY i^9 '! and/orn3wtw&>eofnoLVes,.vaPorrecoverysystems and EVR:PHASElsYste+K n/StM"ing <br /> course does nd eliminate the need'tostr/ctlyadh&V to manufacturerinstrueboraandpmafures when couise does a&e//minete me to sVx-Vy adhere to manufadurerinst ucnats anOprocedures when <br /> insb//irtg a maintaining;wzde.vaAr remverysystems al d EVR PHA5EI Sysam All nozdes, /Malting and mainta/ning nooks;vapor recovery and EVR PHASE/Systems.All nowes, <br /> 1 'i <br /> vapor remverysystems and EVR PHASEI Systems must be ustal/ed and nwntained in aceotdaxe with I, vaporaroverysmarns,old EVR PIiASEI Systems must be installed and ma/n6ioed in accadaxe with <br /> mantokturerinmwimrsandprocedures. rrendfadarb' - <br /> 1 ..,_ „.. <br /> Attestation No.P 3431 Attestation No.P 3430 <br /> ,�-�,. James Day .. Scott Melvin <br /> Walton Engineering Inc. Walton Engineering Inc. <br /> Attended Installation Training for EVR Phase I by OPW,Inc ! Attended Installation Training for EVR Phase I by OPW,Inc. <br /> By:Tom Spindle On:9/26/2006 By:Tom Spindle <br /> On:9/26/2006 <br /> In: Exp Date:9/26/2008 In: Exp Date:9/26/2008 <br /> Completron of the tra/nurg course does not create a warranty o,guaranty by OPW of your in#affanon comp/etion or we tramung course does not create a warranty or guaranty by OPW oow,/nstallabon <br /> and/or rrraintenante ofirozzles,vapor recoverysystena and EVR PHASEIsyste»x 7h6 training ardor ma/nterrano°ofnrozzfes,vaporremverysysterfs and EVR PHASElsysterm fiistruning <br /> ` <br /> course does not eliminate the need to sbidtyadhere tdfranufacturerinsnuctrors ardprocedur�when - course does not etim nate the meed to strzuy adhere to manufaciurerinsbuctio s and procedures when <br /> Instal/ing indmainta/niirgnozz/eS,vapor recoverysystens and EVR PHASE15ystems.Agdozz/es, insta/hng ardma/xa/nng naza'e;vapor recov®yysystens and EW PHA. I$5tems.A//noales, <br /> vapor recovery systems and EVR PHASEI Sysfe rs must be uWaAed and maintained accordance with i! vapor recovery sysbar s and EVR PHASEI Systems must be mita/led and ma/ntained in amardaxe w/th <br /> manLoctuier intro c ns and procedures. manufacturer Instructions andprocedmes. <br /> l <br />