My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 9:01:55 AM
Creation date
6/3/2020 9:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231704
PE
2361
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #2076*
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
157-264-22
CURRENT_STATUS
01
SITE_LOCATION
1030 S OLIVE ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231704_1030 S OLIVE_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />6. Since the under dispenser containment (UDC) pans are being modified to add electrical <br />penetration fittings, an approved test must be performed to determine the integrity of the <br />UDC pans. <br />7. Contact Garrett Backus (468-2986) to arrange the following inspection(s) (a 48-hour <br />notice is required): <br />a. The EHD must witness the functionality of the monitoring system to ensure that <br />monitoring has been restored to meet the requirements of California Code of <br />Regulations Title 23 and the Health & Safety Code. <br />b. The EHD must witness the integrity test performed on each UDC. <br />8. Since concrete is being broken near the UST, pipeline and tank integrity testing must be <br />performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br />guidelines. Results must be received by the EHD within seven days of returning the <br />facility to operating condition. <br />9. An "Underground Storage Tank Certification of Installation/Modification" form (form C) <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] before <br />this upgrade will be considered complete by EHD. <br />10. Permit expires 180 days from date of approval. If an extension to the expiration date is <br />required, a written request must be submitted to the EHD prior to the expiration date. <br />Ga tot REHS <br />S for Registered Environmental Health Specialist <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.