My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:16:30 PM
Creation date
6/3/2020 9:51:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ao Z n FLO) -,a v &M.14"amy 0 tv <br />Implementation of this monitoring alternative will require <br />Weekly Tank Gauging and Annual Tank Integrity testing. If <br />this monitoring alternative is chosen implementation should <br />be carried out as follows: <br />Perform the initial tank integrity test/tests to confirm <br />that the tank/tanks do/does not leak at the time of <br />implementation of the monitoring alternative. Integrity <br />testing must be done within one year prior to <br />implementation of the monitoring alternative. Based on <br />information obtained from facility personnel all/the <br />tanks/tank at this facility have passed an integrity test <br />within the last year. <br />Weekly tank gauging will require that the tank be secured <br />for a period no less than 36 hours. During this time no <br />inputs or withdrawals will be allowed from the tank. The <br />fuel level at the beginning and end of this period will be <br />measured manually using a calibrated stick (or using <br />automatic liquid level sensing.equipment) with an accuracy <br />of +9 gallons. Weekly gauging shall be as specified in <br />Section 2641, Alternative 7 in the Underground Storage Tank <br />Regulations. <br />3) Tank integrity testing to determine that total product loss <br />from the tank does not exceed 0.05 gallons per hour, shall <br />be performed yearly. Integrity testing shall be carried <br />out as described in Section 2543 of the Underground Storage <br />Tank Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.