Laserfiche WebLink
Our Patented Design is the <br />Most Effective and the <br />Most Versatile. <br />The OPW 61SO Overfill Prevention <br />Valve is designed to prevent the overfill <br />of underground storage tanks by pro- <br />viding a positive shut-off of product <br />delivery. The shut-off valve is an inte- <br />gral part of the drop tube used for grav- <br />ity filling. The OPW 61SO allows easy <br />installation (without breaking concrete) <br />and requires no special manholes. <br />The OPW 61SO is a two-stage shut- <br />off valve. When the liquid level rises to <br />about 95% of tank capacity, the valve <br />mechanism is released closing automat- <br />ically with the flow. This reduces the <br />flow rate to approximately 5 gpm <br />through a bypass valve. The operator <br />may then stop the filling process and <br />disconnect and drain the delivery hose. <br />As long as the liquid exceeds the 95% <br />level, the valve will close automatically <br />each time delivery is attempted. <br />If the delivery is not stopped and the <br />liquid rises to about 98% of tank capac- <br />ity, the bypass valve closes completely. <br />No additional liquid can flow into the <br />tank until the level drops below a reset <br />point. <br />Models of the 61 SO are available to <br />meet virtually any UST application <br />including two point, coaxial, poppeted <br />coaxial and remote fill. The 61SO-3000 <br />provides two point overfill protection <br />for 3" riser pipes, and the 61SO-1000 <br />and 6150-100C(CARB) feature a <br />grooved tube design for use with tank <br />gauging systems. Methanol and CARB <br />(vapor tight) approved models are also <br />available. The OPW 61 SO is approved <br />by the New York City Fire Department. <br />(Approval #4902). <br />ER F I L L <br />Features of the 61SO Series: <br />♦ Simple, easy and quick installation <br />— no excavation or special manholes <br />required. <br />♦ Economical — costs a fraction of <br />expensive, complicated and difficult <br />to install valves. <br />♦ Furnished complete — supplied <br />with new upper and lower drop - <br />tubes, mounting hardware and <br />thorough instructions for quick job <br />site time. <br />♦ Completely automatic operation — <br />no prechecks to perform, no resets, <br />and no overrides to be broken or <br />abused. <br />♦ No Pressurization of the tank — <br />operates directly from liquid level. <br />♦ Will accept a dipstick for gauging. <br />♦ Retrofits directly — for both new <br />and existing tanks with 3" or 4" fill <br />risers. <br />♦ Quick drain feature — <br />Automatically drains hose when <br />head pressure is relieved. <br />♦ Best flow rate in the industry.* <br />Advantages of Overfill <br />Prevention Compared to <br />Overfill Warning Systems: <br />® Completely automatic operation — <br />does not rely on the alertness or <br />speed of response of the delivery <br />attendant — for certainty of overfill <br />prevention. <br />® Keeps the top of UST "dry", per <br />EPA requirements — eliminating <br />possible leaks at loose bung fittings <br />and the need for double containment <br />on vent lines. <br />♦ Does not rely on pressure in the <br />UST to stop flow — allowing faster <br />fill times and reducing spill risk. <br />® Speeds delivery operations — <br />product flows unimpeded into the <br />tank until the hose "kick" that <br />accompanies the valve shut-off <br />provides a clear signal that the liquid <br />has reached the shut-off level. <br />® Simple and inexpensive installation— <br />in both two-point and coaxial fill <br />applications, no additional excava- <br />tion, manholes or vent piping is <br />required. <br />][ION VALVES <br />* Test witnessed by Bowser-Morner, <br />Inc., an independent laboratory. <br />Results available upon request. <br />Telephone: (513) 870.3219 • (800) 422-2525 • Fax: (513) 870.9186 • (800) 421-3297 <br />Q 1997 ON Fueling (omponents • P.O. Box 405003 • (incinnati, Ohio 45240.5003 • Printed In USA . TE61 SOF• 4/97 I' <br />-OPW <br />61SO <br />Our Patented Design is the <br />Most Effective and the <br />Most Versatile. <br />The OPW 61SO Overfill Prevention <br />Valve is designed to prevent the overfill <br />of underground storage tanks by pro- <br />viding a positive shut-off of product <br />delivery. The shut-off valve is an inte- <br />gral part of the drop tube used for grav- <br />ity filling. The OPW 61SO allows easy <br />installation (without breaking concrete) <br />and requires no special manholes. <br />The OPW 61SO is a two-stage shut- <br />off valve. When the liquid level rises to <br />about 95% of tank capacity, the valve <br />mechanism is released closing automat- <br />ically with the flow. This reduces the <br />flow rate to approximately 5 gpm <br />through a bypass valve. The operator <br />may then stop the filling process and <br />disconnect and drain the delivery hose. <br />As long as the liquid exceeds the 95% <br />level, the valve will close automatically <br />each time delivery is attempted. <br />If the delivery is not stopped and the <br />liquid rises to about 98% of tank capac- <br />ity, the bypass valve closes completely. <br />No additional liquid can flow into the <br />tank until the level drops below a reset <br />point. <br />Models of the 61 SO are available to <br />meet virtually any UST application <br />including two point, coaxial, poppeted <br />coaxial and remote fill. The 61SO-3000 <br />provides two point overfill protection <br />for 3" riser pipes, and the 61SO-1000 <br />and 6150-100C(CARB) feature a <br />grooved tube design for use with tank <br />gauging systems. Methanol and CARB <br />(vapor tight) approved models are also <br />available. The OPW 61 SO is approved <br />by the New York City Fire Department. <br />(Approval #4902). <br />ER F I L L <br />Features of the 61SO Series: <br />♦ Simple, easy and quick installation <br />— no excavation or special manholes <br />required. <br />♦ Economical — costs a fraction of <br />expensive, complicated and difficult <br />to install valves. <br />♦ Furnished complete — supplied <br />with new upper and lower drop - <br />tubes, mounting hardware and <br />thorough instructions for quick job <br />site time. <br />♦ Completely automatic operation — <br />no prechecks to perform, no resets, <br />and no overrides to be broken or <br />abused. <br />♦ No Pressurization of the tank — <br />operates directly from liquid level. <br />♦ Will accept a dipstick for gauging. <br />♦ Retrofits directly — for both new <br />and existing tanks with 3" or 4" fill <br />risers. <br />♦ Quick drain feature — <br />Automatically drains hose when <br />head pressure is relieved. <br />♦ Best flow rate in the industry.* <br />Advantages of Overfill <br />Prevention Compared to <br />Overfill Warning Systems: <br />® Completely automatic operation — <br />does not rely on the alertness or <br />speed of response of the delivery <br />attendant — for certainty of overfill <br />prevention. <br />® Keeps the top of UST "dry", per <br />EPA requirements — eliminating <br />possible leaks at loose bung fittings <br />and the need for double containment <br />on vent lines. <br />♦ Does not rely on pressure in the <br />UST to stop flow — allowing faster <br />fill times and reducing spill risk. <br />® Speeds delivery operations — <br />product flows unimpeded into the <br />tank until the hose "kick" that <br />accompanies the valve shut-off <br />provides a clear signal that the liquid <br />has reached the shut-off level. <br />® Simple and inexpensive installation— <br />in both two-point and coaxial fill <br />applications, no additional excava- <br />tion, manholes or vent piping is <br />required. <br />][ION VALVES <br />* Test witnessed by Bowser-Morner, <br />Inc., an independent laboratory. <br />Results available upon request. <br />Telephone: (513) 870.3219 • (800) 422-2525 • Fax: (513) 870.9186 • (800) 421-3297 <br />Q 1997 ON Fueling (omponents • P.O. Box 405003 • (incinnati, Ohio 45240.5003 • Printed In USA . TE61 SOF• 4/97 I' <br />