My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:16:30 PM
Creation date
6/3/2020 9:51:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ERGROUND STORAGE TANK <br />Section 13215 — Page 11 <br />4. Hydrostatic/pneumatic (5 psi) piping system test data shall <br />include the amount of pressure applied to the system and the <br />amount of time elapsed prior to depressurization. <br />B. Indeterminate leak rates that can not be isolated to the storage <br />tank or piping system (system leaks) will not be recognized as <br />conclusive. <br />C. If a tank test is inconclusive or is suspended, the reason(s) <br />shall be included along with the tank tester's recommendations. <br />The responsible representative shall be notified verbally within <br />24 hours and a written report shall be submitted. The contractor <br />and the Office of the State Architect field inspector and to the <br />Architect. <br />4. Submission of Certification Documentation <br />All certificates(s) and Reports of Test Procedures and Results shall be <br />submitted to the Office of the State Architect and the responsible <br />facility representative within fifteen (15) days of completion of the <br />test. <br />3.02 PROTECTION, CARE AND CLEANING <br />Protect materials and equipment against moisture, dirt and damage. Clean <br />piping, valves, and equipment installed under this work. <br />3.03 PLACEMENT OF EQUIPMENT <br />Move equipment through openings; disassemble and reassemble and perform other <br />work necessary to accomplish installation. <br />3.04 FORMING, CUTTING AND PATCHING <br />A. New Construction: Provide sleeves, inserts and openings necessary for <br />installation of Mechanical Work, unless required under General Work. <br />B. Alterations: Do all cutting, patching and repairing of existing construc— <br />tion to permit installation, relocation or removal of Work, unless required <br />under General Work. Match existing materials and surfaces. <br />Cut existing (old) construction with special care to prevent damage to <br />structural members and existing work. Drill or core holes in concrete <br />walls or floors. Obtain approval before cutting. <br />3.05 EXCAVATING AND BACKFILLING <br />A. General: Excavate and backfill for installation (or removal) of Mechanical <br />Work, including piping and structures (tanks, vaults, manholes, steam con— <br />duits, tunnels, etc.). <br />1. All excavation shall be in accordance with California Administrative <br />Code, Title 24. <br />R061087:ds :la :ds :ds MAR 702 <br />
The URL can be used to link to this page
Your browser does not support the video tag.