Laserfiche WebLink
Site Health and Safety Plan <br />,Petroleum Related UST Removal <br />Hat of amaroanev ohone numbers. <br />AGENCY I FACILITY <br />PHONE NUMBER <br />CONTACT <br />Police - CHP <br />911 <br />Disoatch <br />Fire / Ambulance <br />911 <br />Dispatch <br />S4 A f'G I H4�pl -fA I <br />Local Hospital <br />-! 400 <br />Emergency Room <br />AES Industrial <br />(916) 345-8562 <br />Office Mgr. <br />6-00 (A/- #6X�O,'-t&t R041d, j4reor-A -CA-,O <br />3. Emergency Procedures, <br />The following standard emergency procedures will be used by on-site personnel. The site safety officer shall be <br />notified of any on-site emergencies and be responsible for ensuring that the appropriate procedures are followed. <br />Personal injury in the Work Zone: <br />Upon notification of an injury in the work zone, the designated emergency signal single horn blast shall be <br />sounded. All site personnel shall assemble at the AES Industrial truck. The rescue team will enter the <br />work zone to remove the injured person to outside the unsafe area. The site safety officer and project team <br />leader should evaluate the nature of the injury, and the affected person should be decontaminated to the <br />extent possible prior to movement to the support zone. The project team leaders shall initiate the <br />appropriate first aid, and contact should be made for an ambulance through 911 and with the designated <br />medical facility. No persons shall reenter the work zone until the cause of the injury or the symptoms is <br />determined. <br />Personnel Injury in the Support Zone: <br />Upon notification of an injury in the support zone, the project team leader and site safety officer YAII assess <br />the nature of the injury. If the cause of the injury or the loss of the injured person does not affect the <br />performance of site personnel, operations may continue, with the site safety officer initiating the appropriate <br />first aid and necessary follow-up as stated above. If the injury increases the risk to others, the designated <br />emergency signal shall be sounded and all site personnel shall move the meet at the AES Industrial truck <br />for further instructions. Activities on site will stop until the added risk is removed or minimized. <br />C. Fire/Explosion: <br />Upon notification of a fire or explosion on site, the designated emergency signal hom blast shall be <br />sounded and all on-site personnel assembled at the AES truck, provided it is out of the fire area. The fire <br />department shall be alerted and all personnel moved to a safe distance from the involved area. <br />d. Spill / Release: <br />Remove all ignition sources. Evacuate non-essential personnel from the spill area. Don appropriate PPE <br />and respiratory equipment. Control and contain the spill with absorbents or dikes. Use appropriate <br />adsorbents to collect spilled liquids. Use appropriate containers for transportation and disposal purposes. <br />Notify appropriate local, state, and federal agencies and AES. <br />K11 <br />