Laserfiche WebLink
FROM : SIDHU GURP PHONE NO. 209 474 3210 Nov. 13 2006 12:51PM P2 <br /> SWRCB,January 2002 <br /> Page 3 of 7 <br /> WM'F,RLOO FOOD&FUEL <br /> 3032 E. Waterloo Road <br /> Stockton,CA 95205 <br /> May 31,2005 <br /> S. SECONDARY PIPE TESTING <br /> —Test Method beve�loiped By, Piping Manufacturer rXI Industry Standard Professional <br /> Engineer <br /> I Other(Specify) <br /> Test Method Used: (X Pressure Vacuum Hydrostatic <br /> Other(Spec& <br /> a. <br /> Test uiment Used:Pressure Gauge Nuipment Resolution: 0.20 <br /> Piping Run ffS&6 Piping Run#3&4 Piping Run 0 <br /> Pi2ing Regular/Unlead Super/Unlead Diesel <br /> Material: <br /> Piping Manufacturer: <br /> Piping Diameter: 2" 3" <br /> Len g!h of Pi in Run: 75' 75' 75' <br /> Product Stored: Regular Unleaded Super Unloaded Diesel <br /> .............. <br /> Method and location of 2 x 3 Boot 2 x 3 Test Boot 2 x 3'1".est Boot <br /> 212)n -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MINUTES 5 MINUTES <br /> Starting test: <br /> Test Start Time; 9:05 A.M. 9:05 A.M. 9:10 A.M. <br /> initial Beadin&ft _ <br /> . 5 LBS. 5 LBS. <br /> l) <br /> ............ <br /> Test End Time: 9:35 A.M. 9:40 A.M. <br /> Final Reading(Rf)-. 5 LBS. 5 LBS, <br /> Test Duration: Y2 HOUR V2140UR <br /> Cham=e in Reading(Rf-Rl) -0- -0- <br /> Pass/Fail Threshold or See Notes Below PASS PASS <br /> Criteria- <br /> f)PASS:[XlYafl lX1,Pass 1 ]'Fail fxl PASS 1, 1 <br /> Fail <br /> Comments–(include information on repairs made prior to testing,and recommended follow-tip for failed tests) <br /> NOTES: REGULARIUNLEADED#5&6 <br /> REQUIRES: 1. BOOTS <br /> 2. TANK TO DISPENSER 5&6 <br /> 3. VAPOR NOT DOUBLE WALLED <br />