My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 6 Apply a bead of Slue Seal Glue along the gasket rim and install <br /> the boot onto the seal. Install boot with fill tube at the lx:®O <br /> position.Install band clamp to secure the boot to the gasket. <br /> STEP 7 Position the insert into the boot if applicable,but do not tighten } <br /> the clamp.This connection must remain loose through the filling <br /> stage to allow air to escape. <br /> STEP a Fill the boot with either Parasealant 626, or Bostik IIOOFS <br /> through the fill tube with the Blueline pneumatic dispensing gun <br /> until the entire cavity is full. This will ensure that the sealant <br /> pushes back through the leak point and stops the leak. <br /> i <br /> 1 <br /> STEP 4 Once the boot is fun,tighten clamps and allow sealant to fully <br /> cure. <br /> ............ ............... .............. <br /> i <br /> I <br /> I <br /> I <br /> •" C1 sireir-ass-Goa dei =eO so Ta Deg <br />
The URL can be used to link to this page
Your browser does not support the video tag.