My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:16:06 PM
Creation date
6/3/2020 9:52:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 ! <br />WEATHERPROOF <br />JUNCTION BOX <br />(1 PER SENSOR) <br />1/2" RIGID <br />CONDUIT <br />""�4 a <br />TOFROM <br />MONITOR SENSOR <br />s <br />Figure 36. Two -Wire Sensor Field Wiring Diagram. <br />C. INSTALLATION OF FLOAT SWITCH — <br />FIBERGLASS TANKS. <br />1. To ensure the sensor will reach the bottom of the annular <br />space, the splice between the leader cable and the sensor <br />must be 1 foot from the bottom of the riser pipe (see Figure <br />37, "Float Switch Installation — Fiberglass Tank"). First <br />measure the sensor riser pipe from the bottom of the pipe <br />to the top. Subtract one foot from the riser pipe <br />measurement, then measure that distance up the leader <br />cable from its connection to the sensor; mark the leader <br />cable. <br />CAUTION: DO NOT USE A KNIFE OR OTHER SHARP <br />OBJECT TO MARK THE LEADER CABLE. MARK THE <br />DISTANCE WITH A MARKER, TAPE, ORA TWIST TIE. <br />NOTE: To ensure proper operation of the float switch, <br />® it is important that you order and install the correctly <br />sized sensor in your fiberglass tank. This ensures the <br />float switch will rest as close as possible to the bottom <br />of the tank annulus (see Figure 39; "Sensor Switch <br />Position at Bottom of Tank Annulus"). <br />2. Feed the sensor into the riser pipe until the sensor reaches <br />the top cavity of the tank and rests at the beginning of the <br />annulus (see Figure 38, "Sensor Switch Position at Top of <br />Tank Annulus"). <br />.� NOTE: The sensor's float is designed with a bend to <br />® control direction of installation in your tank annulus. <br />Red dots are painted on the top of the switch and 4 feet <br />up the sensor, as position references during instal- <br />lation. When installing the sensor, the switch will first <br />appear to be upside-down, with the dot facing the bot- <br />tom (see Figure 38). The switch will rest right-side-up <br />at the bottom of the tank (see Figure 39, "Sensor Switch <br />Position at Bottom of Tank Annulus"), with the refer- <br />ence dots facing in toward the tank. <br />NOTE: Pull -Cord Installation Method. To ensure <br />proper installation of the sensor using a pull cord, the <br />reference marking 4 feet up the sensor should face <br />toward the pull cord. An eyelet has been provided at <br />the end of the sensor for pull -cord installation (see <br />Figure 38). <br />Site Preparation and Installation nstructions <br />EMC UST Monhori-anSystem <br />3. Before continuing, verify correct switch positioning by <br />connecting an ohm meter to the two -wire cable of the <br />interstitial sensor. The ohm meter should read 00 <br />(continuity) at this point. If the meter reads 100kQ, the <br />float switch is in the wrong position and must be re- <br />installed correctly. <br />4. If the switch reads 00, continue to feed the switch into the <br />annular space, until the switch reaches the bottom of the <br />tank (the splice between the sensor and leader cable <br />should be 1 foot from the bottom of the riser pipe). <br />5. Verify the switch is in the correct position by connecting <br />the ohm meter to the two -wire cable. The ohm meter will <br />read 100kn if the sensor is properly installed. <br />6. Secure the riser cap to the riser pipe. <br />7. Tighten the cable bushing nuts on the riser cap and junc- <br />tion box to ensure a water -tight seal at the cable entry. <br />8. Using wire nuts, connect the two -wire sensor cable to the <br />field wires in the sensor junction box (see Figure 36, ' wo- <br />Wire Sensor Field Wiring Diagram). Since these are <br />contact switches, polarity is not a consideration when <br />connecting sensor wires to field wires. <br />NOTE: SEAL WIRE NUT CONNECTIONS AT THIS <br />TIME USING epoxy sealant, furnished with each sensor. <br />WARNING: EPDXY SEALANT MAYBEIRRITATING <br />TO EYES AND SKIN. MAY CAUSE SKIN SENSITI- <br />ZATION IN SUSCEPTIBLE INDIVIDUALS. MAY BE <br />SORBED THROUGH THE SKIN. EPDXY SEAL- <br />ANT CONTAINS EPDXY RESIN AND VINYL CYCLO - <br />HEXENE DIOXIDE. VINYL CYCLOHEXENE DIOX- <br />IDE HAS CAUSED SKIN CANCER IN ANIMAL <br />TESTS. <br />PRECAUTIONS: AVOID EYE AND SKIN CONTACT. <br />WEAR IMPERVIOUS GLOVES AND SAFETY GLAS- <br />SES. USE ONLY IN WELL VENTILATED AREAS. <br />IX" MINIMUM <br />DIA <br />MANHOLE <br />2 CORD GRIP <br />SEALS <br />SUPPLIED WITH <br />SENSOR <br />WEATHERPROOF <br />JUNCTION BOX WITH <br />lit INCH NPT THOS <br />I16 CUBIC INCH <br />MINIMUM) <br />EPDXVSEaL <br />PER NFPA <br />SPEC <br />TO PROBE <br />JUNCTION BOX <br />-2"REDUCER <br />LEADER <br />CABLE <br />2" DIA RISER <br />SP ICE <br />IFOOTFROM <br />BOTTOM OF RISER PIPE <br />SENSOR <br />SENSOR SW ITCH <br />MUST EACH <br />BOTTOM OF TANK <br />FIBERGLASS TANK <br />NEE <br />I.— <br />WEW OF SENSOR SWITCH <br />AI SOTI0M OF IAN. <br />Figure 37. Float Switch Installation — Fiberglass Tanks. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.