Laserfiche WebLink
Oonitoring System Certification <br />Site Address: d3dd WATFRI.O0 RD <br />F. In -Tank • r / SIR Equipme , <br />Date of Testing/Service: 03/14/2002 <br />® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comalete the following checklist: <br />El Yes <br />❑ No * <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No * <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El Yes <br />❑ No * <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No * <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No * <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No * <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />- in the Secuon n, Deww, uubuiuC mw anu -11-i anvac a*c n..�n... .� ..• ..•^ •---_..__.__. <br />G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br />d%-- 1-4- ♦6® f -11—i— rha kliaf- <br />® Yes <br />[:]No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ® 3 g.p.h ❑ 0.1 g.p.h ❑0.2 g.p.h <br />Yes <br />® <br />E]No * <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No <br />Was the testing apparatus properly calibrated? <br />❑Yes <br />❑ No * <br />©N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® Yes <br />E] No : <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® Yes <br />-]No * <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® Yes <br />❑No * <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® Yes <br />❑No * <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Pq Yes <br />I ❑No' <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />- in the Secuon r9, Mow, oesunue now allu w11tli1 ul— uclwlc•n Hca vxc�c v *.••• <br />H. Comments: <br />page <br />