My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 1:18:05 PM
Creation date
6/3/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2012-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HeGHVED <br /> IAS! 201 <br /> F.In-Tank Gauging/SIR Equipment: WO Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment iq°4 . `� "tl <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Nas accuracy of system product level readings tested? <br /> Yes No* Nas accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> * Yes r No* or equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A app/y)Simulated leak rater 3 g.p.h.; r 0.1 g.p.h; i 0.2 g.p.h. <br /> * Yes > No* Nere all LLDs confirmed operational and accurate within regulatory requirements? <br /> + Yes r No* Nas the testing apparatus properly calibrated? <br /> Yes r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> e N/A <br /> +r Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> Yes No* or electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A Im <br /> onitoring system is disabled or disconnected? <br /> Yes No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> r N/A monitoring system malfunctions or fails a test? <br /> o Yes No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> ro Yes IrNo* Pere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.