My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: F Piping Manufacturer F7 Industry Standard F Professional Engineer <br /> f-Other(Specify) TAL�4EAL <br /> TH <br /> Test Method Used: rl-Pressure r Vacuum r-Hydrostatic <br /> r-Other(Specify) <br /> Test Equipment Used: 4" Dial Guage Equipment Resolution: .2 <br /> Piping Run Piping Run Piping Run Piping Run <br /> UE02OU00I Supp/Rd UE02OU00I Vern <br /> Piping Material: Poly Fiberglass <br /> Piping Manufacturer: Total Containment AO Smith <br /> Piping Diameter: 4" 3" <br /> Length of Piping Run: Approx.40' Approx. 35' <br /> Product Stored: Diesel Diesel <br /> Method and location of piping-run Test Boots Test Boots <br /> isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. 15 min. <br /> starting test: <br /> Test Start Time: 9:50 am 9:50 am <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 10:50 am 10:50 am <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result: Pass F Fail F Pass Fail r- Pass F Fail Pass Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.