Laserfiche WebLink
0 RECEIVED <br /> 6.PIPING SUMP TESTING - <br /> Test Method Developed By: F Sump Manufacturer Industry Standard F Professional Engineer <br /> F Other(Specify) <br /> Test Method Used: r Pressure F Vacuum F HydrostaticT <br /> Other(Specify) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: .0006 <br /> Sump Sump Sump Sump <br /> UE020U001 <br /> Sump Diameter: 4Q" <br /> Sump Depth: 45" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14" <br /> Electrical Penetration: <br /> Condition of sump prior to Good <br /> testing : <br /> Portion of Sump Tested(1) 2" above high pen. <br /> Does turbine shutdown when g� <br /> sump sensor detects liquid(both y�) Yes 1 p No r NA f Yes r Nor NA r Yes I Nor <br /> y NA Yes r No 1 NA <br /> product and water)?* <br /> Turbine shutdown response time NA <br /> Is system programmed for fail- g; p� y g� r� <br /> safe shutdown?* Yes g+�--' No FV NA g Yes r No 1 NA F Yes r No yr NA Yes No g1-- NA <br /> Was fail-safe verified to be F''Yes 1 Nor NA 9 Yes F No F NA # Yes d No 1 NA F Yes F No i NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 10:39 am 10:54 am <br /> Initial Reading(R,): 2.6610 2.6610 <br /> Test End Time: 10:54 am 11:10 am <br /> Final Reading(RF): 2.6609 2.6610 <br /> Test Duration: 15 min. 115 min. <br /> Change in Reading(RF.R�: .0001 1.0000 <br /> Pass/Fai I Threshold or Criteria: 002 .002 <br /> Test Result: ry Pass g <br /> Fail Pass F�a°il Pass !Fail gra Pass � Fail <br /> Was sensor removed for testing? F, es g� <br /> Y <br /> No t NA Yes 1yNo!pNA F Yes 6 No F NA Yes No 9{ NA <br /> Was sensor properly replaced and r- J- [_ No NA <br /> verified functional after testing? Yes d No NA Yes No NA Ys No NA Yes <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The sensors were reinstalled to the lowest point,but not tested. <br /> (1)If the entire depth of the sump is not tested, specify how much was tested If the answer to any of the questions indicated <br /> with an asterisk(*)is"NO"or"NA",the entire sump must be tested (See SWRCB LG-160) <br />