My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inIVED <br /> ventory con ro. <br /> FCheck this box if no tank gauging or SIR equipment is inAf kdo 9 1 <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. ENVIRONMENTAL <br /> Complete the followm checklist: HEALTH DEPARTMENT <br /> Yes f— No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> r Yes F No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> F Yes F No* Was accuracy of system product level readings tested? <br /> Yes F No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> F Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: _ <br /> Yes No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> N/A all that apply)Simulated leak rate: F 3 gp.h.; F 0.1 g.p.h; F 0.2 g.p.h. <br /> r— Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes F No* Was the testing apparatus properly calibrated? <br /> r Yes F No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> r Yes F No* For electronic LLDs,does the turbine automatically shutoff if the LLD detects a leak? <br /> • Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> r Yes F No* For electronic LLDs,does the turbine automatically shut off if any porti on of the monitoring system malfunctions or <br /> N/A fails a test? <br /> µYes F No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes F No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *IntheSection H,below,describehow and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.