My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> D.Results of Testing/Servicing APR 0 9 2014 <br /> Software Version Installed: 122.00 EWIRONMEWAL <br /> Complete the following checklist: HEALTH DEPARTMENT <br /> Yes r No* Is the audible alarm operational? <br /> r Yes r No* Is the visual alarm operational? <br /> Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> F Yes F No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> ro r o ration? <br /> Yes F No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> N/A operational? <br /> WNWANWANVAIMM <br /> Yes FNo* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> N/A containment monitoring system detects a leak,fails to operate, or is electrically disconnected?If yes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> Sump/TrenchSensors; r' Dispenser Containment Sensors. Did you confirm positive shut-down <br /> due to 1 eaks and sensor failure/disconnection? <br /> Yes; F No. <br /> F Yes r N o* For tank systems that utilize the monitoring system as the primary tank overf ill warning device(i.e. no <br /> r N/A mechanical overfill prevention valve is installed),is the overfill waming alarm visible and audible at the <br /> tank fill point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger? <br /> oda <br /> Yes � No y g� <br /> * �dxx Was any equipment replaced?If yes,identify specific sensors probes,or other equipment <br /> _ replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* F No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br /> apply) r Product; Water.If yes,describe causes in Section E,below. <br /> Yes F No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E belay,describe how and when these deficiencies were or will be corrected. ry <br /> E. Comments: <br /> Other sensors from page one: <br /> L4 Generator Floor 794380-208/NA:Certified <br /> L5 Fire Box 794380-208/730237: Certified <br /> The drop tube is equipped with a mechanical overfill prevention valve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.