Laserfiche WebLink
UST Monitoring Site Plan <br /> Site Address : 124 W.ELM ST.,Lodi,95240 <br /> Monitoring Pian Site Map <br /> Gereral f-jap Syeste Layout <br /> r:.Wirg 1a�r=_#o Scair <br /> B;,s.n?s.s Nanle. F�acfic Be I TYsephor>e Co, dba AT T Cal, 1LtC20 <br /> Busiress Add!ess. 124 A,Elm, 54 Lodi <br /> AT&T Buildingani <br /> t <br /> Engine Room 794380-20$ <br /> in Basement 'RiAxr,Pow +ia <br /> Serif,L; F4171.2 tLItrr.fir <br /> TLS-311 j, "Yr T s7?;t <br /> t' <br /> Ver 127.0 . 794380-208 <br /> y s 794380-208 <br /> 1 <br /> AnT a <br /> 794380-344 794390-420 <br /> 5 <br /> �, <br /> 794380.208 bad* m N <br /> W+E <br /> Date map was drawn: 4/19/2012 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels; sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />