Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section mustbe completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes F No Has all input wiring been inspected for proper entry and termination including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> .. Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> .....�..._ Were all robesre•. <br /> Yes F No p installed properly? <br /> Yes r No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): F Checkthis box if LLDs are not installed. <br /> Complete the following checklist_: <br /> _-- * Forequipment�start-u annual <br /> Yes r Nop or ual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F N/A all that apply) Simulated leak rate: F3 gp.h.; F 0.1 g.p.h; F 0.2 g.p.h. <br /> 1 <br /> F Yes F No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Was the testing apparatus properly calibrated? <br /> Yes F No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> _ <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> F N/A <br /> _�:-W .._....._. .. <br /> Yes F No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> �:_ ... _ .......................................... <br /> Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> • Yes F No* For electronic LLDs,have all access iblewiring connections been visually inspected? <br /> F N/A <br /> • Yes f— No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *IntheSection K below,describe how and when these deficiencies were or will be corrected. <br /> H. C om ments: <br /> Suction System. <br />