My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.TANK ANNULAR TESTING <br /> Test Method Developed By: Tank Manufacturer F Industry Standard r Professional Engineer <br /> Other(Specify) <br /> Test Method Used: F Pressure F vacuum F Hydrostatic <br /> F Other(Specify) <br /> Test Equipment Used: 4" Dial Gauge Equipment Resolution: .05 <br /> Tank Tank Tank Tank <br /> UE020U00I <br /> Is Tank Exempt From Testing?cl) Yes F No Yes r- No Yes r No FYes F No <br /> Tank Capacity: 8,000 Gal <br /> Tank Material: Steel/Fiberglass <br /> Tank Manufacturer. Modern Welding <br /> Product Stored: Diesel <br /> Wait time between applying <br /> pressure/vacuum/water and 1 Hour <br /> starting test: <br /> Test Start Time: 9:30 am <br /> Initial Reading(R,): -10 HG <br /> Test End Time: 10:30 am <br /> Final Reading(RF): -10 HG <br /> Test Duration: 1 hour <br /> Change in Reading(RF RI): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: F °�Pass Fail ges 1 r- Pass- r-Fail r- Pass [- Fail <br /> r-Fail Pass Fail <br /> FWas sensor removed for testing? Yes 1 No r- NA 1... YNo r- NA 6 Yes i No F NA 9 Yes F No f NA <br /> Was sensor properly replaced and yam ` <br /> verified functional after testing? Yes No NA 1 Yes r- No r NA # Yes r No NA r Yes No NA <br /> Comments-(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> Reinstalled sensor to lowest point but not tested. <br /> i <br /> � <br /> O1 Secondary containments stems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic <br /> containment testing.{California Code of Regulations,Title 23, Section 2637(a)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.