My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.SECONDARY PIPE TESTING <br /> Test Method Developed By: r Piping Manufacturer Industry Standard Professional Engineer <br /> r Other(Specify) <br /> Test Method Used: Pressure Vacuum F Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: 4" Dial Gauge Equipment Resolution: .05 <br /> Piping Run Piping Run Piping Run Piping Run <br /> Supply/RetUE020U001 Vent Sec.M20U001 <br /> Piping Material: Poly Fiberglass <br /> Piping Manufacturer: Total Containment A O Smith <br /> Piping Diameter: 4" 3" <br /> Length of Piping Run: Approx.40' Approx 35' <br /> Product Stored: Diesel Diesel <br /> Method and location of piping-run Test Boot Test Boot <br /> isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min 15 min <br /> starting test: <br /> Test Start Time: 9:30 am 9:30 am <br /> Initial Reading(R1): 5 PSI 5 PSI <br /> Test End Time: 10:30 am 10:30 am <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I hour 1 hour <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result: I F Pass F Fail Pass F Fail Pass r—Fail I F Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.