Laserfiche WebLink
UST Monitoring Site Plan <br /> Site Address : 124 W.ELM ST.,Lodi,95240 <br /> Monitoring Plan it <br /> autGveal FW 5��Ilw W�W <br /> ' no dTt <br /> RPI St Lcdl <br /> ,En <br /> I <br /> W Building <br /> Engine Rrn <br /> in <br /> Sno <br /> `fit 7_142K-208 .� . <br /> g <br /> 794380-2,03 <br /> C s ""I M <br /> 7043K,344 Q <br /> a119� r <br /> v 2008 a $ <br /> Date map was drawn: 9/23/2011 <br /> Ins truction s <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels;sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />