My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1994-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:42:17 PM
Creation date
6/3/2020 9:53:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2006
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1994-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fuel Spills & Cleanup Procedures <br /> • Safety First — Don't Panic <br /> Spill Response Procedures <br /> — Stop Flow <br /> • Emergency Shutoff(ESO} <br /> • Main Electrical Panel <br /> — Assess / Determine Severity <br /> — Customer/ Employee Safety <br /> • Restrict Access <br /> • Evacuate Area <br /> (c)2005.Tait&Associates,Inc. <br /> As a facility employee, you play a critical role as the "first responder" to <br /> hazardous substance spills or releases. In the event of a release, stay calm, <br /> panicking will destabilize the situation and create even more safety hazards. <br /> Stop the release as soon as possible by exercising the Emergency Shutoff <br /> Switch or by cutting off power at the main electrical panel. Show each <br /> employee the ESO and explain its function. <br /> Once the flow has been stopped, assess the situation. The first priority should <br /> be to eliminate the risks of exposure to your customers or other employees. <br /> Restrict access to the affected area. If the severity of the release dictates, <br /> evacuate the site except for required personnel. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.