Laserfiche WebLink
f , <br /> F. In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> w; <br /> jy_ _ <br /> No* Has all input wrong been inspected for proper entry and termination,including testing for ground faults i <br /> FNo* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> F No* Was accuracy of system product level readings tested? <br /> I--,---,,- <br /> . ....,_,,r— No* Was accuracy of system water level readings tested? <br /> __ d No* Were all probes reinstalled properly?rF No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> F Yes F No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F' N/A all that apply) Simulated leak rate: F 3 g.p.h.; F 0.1 g.p.h; 0.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> _..... <br /> f— Yes F No* Was the testing apparatus properly calibrated? <br /> . <br /> F Yes F No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F'' N/A <br /> F Yes r— No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r' N/A <br /> �,,,.. <br /> .F Yes F No* For electronic LLDs,does the turbine automatically shut off if any <br /> portion of the monitoring system is disabled or <br /> FI N/A disconnected? <br /> V <br /> r Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> F N/A fai is a test? <br /> F Yes F No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> F N/A <br /> Yes � No* Were all items on the equipment manufacturee's maintenance checklist completed? <br /> In theSectlon <br /> � <br /> * H,below,descrbehow and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction System <br />