My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f , <br /> F. In-Tank Gauging/SIR Equipment: <br /> Check this box if tank gauging is used only for inventory control. <br /> F Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> w; <br /> jy_ _ <br /> No* Has all input wrong been inspected for proper entry and termination,including testing for ground faults i <br /> FNo* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> F No* Was accuracy of system product level readings tested? <br /> I--,---,,- <br /> . ....,_,,r— No* Was accuracy of system water level readings tested? <br /> __ d No* Were all probes reinstalled properly?rF No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> F Yes F No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> F' N/A all that apply) Simulated leak rate: F 3 g.p.h.; F 0.1 g.p.h; 0.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> _..... <br /> f— Yes F No* Was the testing apparatus properly calibrated? <br /> . <br /> F Yes F No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> F'' N/A <br /> F Yes r— No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r' N/A <br /> �,,,.. <br /> .F Yes F No* For electronic LLDs,does the turbine automatically shut off if any <br /> portion of the monitoring system is disabled or <br /> FI N/A disconnected? <br /> V <br /> r Yes No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> F N/A fai is a test? <br /> F Yes F No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> F N/A <br /> Yes � No* Were all items on the equipment manufacturee's maintenance checklist completed? <br /> In theSectlon <br /> � <br /> * H,below,descrbehow and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction System <br />
The URL can be used to link to this page
Your browser does not support the video tag.