Laserfiche WebLink
t <br /> D.Results of Testing/Servicing <br /> Software Version Installed: 123.01 <br /> Complete the following checklist: <br /> Yes r No* Is the audible alarm operational? <br /> Yes r No* Is the visual alarm operational? <br /> R Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes N_ <br /> .,.. <br /> F, * Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> ro r o eration? <br /> F Yes No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> F N/A operational? <br /> FARVARIONEWan <br /> F Yes r No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> F N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> F Sump/TrenchSensors; r Dispenser Containment Sensors. Did you confirm positive shut-down <br /> due to leaks and sensor failure/disconnection? <br /> ( rYes; FNo. <br /> F Yes F No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the <br /> F N/A tank fill point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger? <br /> F Yes* r No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* �' No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that <br /> apply) r' Product; r Water.If yes,describe causes in Section E,below. <br /> _ <br /> ------------- <br /> Yes <br /> .. ___ * Was monitoringsystem set-up reviewed to ensure proper settings?Attach et reports, <br /> r Yes r No � Y P pop g ? h set up reports,if applicable <br /> Yes r No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected <br /> E. Comments: <br /> System is running CSLD <br /> Audio/Visual Mounted on outside wall within View of Fill <br /> L-2 Fill sump Sensor 794380-208 675676 was replaced like for like 794380-208 917920 and certified <br /> Other sensors <br /> L-3 Middlesump sensor 794380-208 cerified <br /> L-5 Supply Transit Box 794380-208 certified <br /> L-6 Vent Transit Box 794380-208 certified <br /> L-7 Pump Pan Sensor 794380-208 certified <br />