Laserfiche WebLink
E <br />SWRCB, January 2002 Page 4 of 5 <br />6. PIPING SUMP TESTING <br />Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used ❑ Pressure ❑ Vacuum N Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon TS -STS 71Equipment Resolution: .0006 <br />Sump # UE042U001 Sump # I Sump # Sump # <br />Sump Diameter <br />38" <br />Sump Depth <br />41" <br />Sump Material <br />Fiberglass <br />Height from Tank Top to Top of <br />Hi hest Pininja Penetration <br />16" <br />Height from Tank Top to Lowest <br />Electrical Penetration <br />10" <br />Condition of sump prior to testing <br />Good <br />Portion of Sump Tested (1) <br />2" above pen <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />NA <br />Is sytem programmed for fail-safe <br />shutdown?* <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />15 MIN <br />Test Start Time <br />12:02 PM 12:18 PM <br />Initial Reading Ri) <br />5.2276 5.2271 <br />Test End Time <br />12:17 PM 12:33 PM <br />Final Reading R <br />5.2270 5.2268 <br />Test Duration <br />15 MIN 15 MIN <br />Change in Reading Rf-Ri <br />.0006 .0003 <br />Pass/Fail Threshold or Criteria <br />.002 <br />Test Result <br />N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />N Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Ycs ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑ Yes N No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br />The sensor was reinstalled to the lowest point but not tested. <br />(1) If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or `STA", the entire sump must be tested. (See SWRCB LG -160) <br />