Laserfiche WebLink
-.r <br />SWRCB, January 2002 Page 2 of 3 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed by ❑piping Manufacturer ®Industry Standard ❑Professional Engineer <br />❑Other (Specify) <br />Test Method Used ®Pressure ❑ Vacuum ❑Hydrostatic <br />❑Other (Specify) <br />Test Equipment Used: 4" Liquid Gauge Equipment Resolution:.I <br />Piping Run #Vent Piping Run # Piping Run # Piping Run # <br />UE042U001 <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />AO Smith <br />Piping Diameter: <br />4.0" <br />Length of Piping Run: <br />Approx. 25 Feet <br />Product Stored: <br />Diesel <br />Method and location of piping -run <br />isolation: <br />Test Boot <br />Wait Time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 min <br />Test Start Time: <br />9:01 AM <br />Initial Reading (Ri): <br />5 PSI <br />Test End Time: <br />10:01 AM <br />Final Reading (Rf): <br />5 PSI <br />Test Duration: <br />I Hour <br />Change in Reading (Rf - Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />Test Result <br />®Pass El Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />El Pass ❑Fail <br />Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests <br />Replaced Vent Line secondary test boot in fill sump. <br />