Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: SEP 181 <br />% Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR e i ' <br />, ft- HEALTH <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. . k� w <br />ENT <br />*In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): P Check this box if LLDs are not installed. <br />Complete the following checklist: <br />r YesF <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br />N/A <br />all that apply) Simulated leak rate: F 3 g p.h.; F 0.1 g. p. h ; r— 02 g.p.h. <br />F Yes <br />F No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />• Yes <br />F No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />FNo* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />• Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />r' N/A <br />• Yes <br />r No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />r— N/A <br />disconnected? <br />Yes <br />• No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions• or <br />N/A <br />fails a test? <br />Yes <br />F No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />F Yes <br />F No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />N VY <br />* r will be erected. <br />IntheSection H, below, descrbehow and when these deficiencies were e oo„ <br />H. Comments: <br />System. <br />