Laserfiche WebLink
UST Monitoring Site Plan RECEIVED <br />Site Address : -145 N. SAN JOAQUTN, Stockton, 95202 SEP 18 2014 <br />4VU0.101 Monitoring Plan Site Map ENVIRONMENTAL HEALTH <br />aw DEPARTMENT <br />Business Name: Pacific Bell Telephone Co. dbaAT&T Cal. (UE042) <br />Business Address: 345 N. San Joaquin Stock -ton <br />At <br />UE042UOOI <br />Piping <br />25K UST <br />S <br />ump W/ Diesel <br />Sensor (L4) Middle Sump w/ Sensor(L3) 794380-208 <br />794380-208 i <br />—Fill Sump w/ Sensor (L2) Drawing NOT <br />A� <br />t 7943OG-208, ATG Vent and Day Tank to Scale <br />C, -.Annular Sensor Return Lines <br />(LI)794390-420 <br />c�; <br />overflll:�__. - - - - - - C2 Annular <br />Ai 7QA1Qn_WA <br />Date map was drawn: 8/26/2014 <br />Instructions <br />FA <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />Containment <br />-20" <br />Vent Sump w/Sensor (1-6) 794380-208 <br />794380 <br />--Pan Sensor <br />mounted nted <br />Roof mounted <br />-208 <br />(L7)794380 Vent <br />Riser <br />Engine <br />Engine <br />rn rn N Enclosure <br />Enclosure <br />TLS 350 Plus <br />in Basement <br />2, <br />f1A <br />UE04 6 <br />UE04 A 6 <br />E <br />200 g I B Ily TZ <br />12 200 g IB IlyTank <br />J <br />Supply <br />Basement Area <br />Transition <br />L10 Hi Level <br />L10 H, Le <br />Sump W/ <br />UE042AO05 794390-420 <br />7 43 -4 <br />9 go <br />Sensor (L5) <br />L9 Hi Level <br />Tank <br />500 500 gal Belly Tank <br />7W80-208 <br />794390-420 <br />CM se from L12 Gen Floor 2 <br />Ba ement to Roof 794380-208 <br />Ll 1 Gen Floor I/ <br />794380-208 <br />A <br />AT&T building <br />Annular <br />4th <br />4 Floor Roof <br />79438 0-344 <br />L13 Sec. Pipe Roof <br />Basement Fuel <br />Lines L8 Trans- Box <br />794380-208 <br />794380 208 <br />Date map was drawn: 8/26/2014 <br />Instructions <br />FA <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other <br />secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />