My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:33:21 PM
Creation date
6/3/2020 9:53:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 4"dial gauge Equipment Resolution: .2 <br /> Emer RetrnUE0420001 <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: Y <br /> Length of Piping Run: 25' <br /> Product Stored: Diesel <br /> Method and location of test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 9:22am <br /> Initial Reading(RI): 5 psi <br /> Test End Time: 10:22am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hour <br /> Change in Reading(RF-RI): 10 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: El Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.