Laserfiche WebLink
SEP 0 9 <br /> Aim <br /> To investigate the integrity of the UPSSs as a due diligence exercise. "- <br /> Method <br /> An individual test was performed on the diesel transfer pump line. <br /> Summary of Line Results as Tested <br /> Line Test Round 1 <br /> Description Date Result <br /> UE0420001 Transfer Pump To UE042AO05 Belly Tank 17-Aug-16 PASS <br /> Leighton O'Brien PM2 test equipment&procedure used <br /> Comments/Discussions <br /> The Diesel line from the transfer pump to the belly tank passed the test. <br /> Recommendations <br /> There are no recommendations. <br /> Stockton AT&T CA TA6181 Diagnostic Report to 17-Aug-16.doc Page 2 of 3 <br />