Laserfiche WebLink
D. Results of Testing/Servicing SEP 0 9 ZO16 <br /> Software Version Installed: 123.01 <br /> Complete the following checklist <br /> - <br /> No*Emlli <br /> Yes ❑No* Is the audible alarm operational? <br /> Yes ❑No* Is the visual alarm operational? <br /> ❑X Yes ❑No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> QYes ❑No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> NOMMENEENNUM <br /> ro er o ration'? <br /> ❑X Yes ❑No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> ❑N/A operational? <br /> ❑ Yes ❑No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary <br /> Q N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?Ifyes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> ❑Sump/Trench Sensors; ❑Dispenser Containment Sensors. Did you confirm positive shut-down <br /> fi <br /> to leaks and sensor failure/disconnection? <br /> Yes; El No. <br /> ❑ Yes ❑No* Fortank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no <br /> mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the <br /> 0 N/A tank fill point(s) and operating properly?If so, at what percent of tank capacity does the alarm trigger? <br /> [--]Yes* FX-j No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> =Yes* <br /> ❑X No Was liquid found inside any secondary containment systems designed as dry systems? (Check all=that <br /> apply) ❑Product; ❑Water.If yes,describe causes in Section E, below. <br /> ❑X Yes ❑No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> _NYes ❑No* Ils all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were orwill be corrected. <br /> E. Comments: <br /> Other Sensors From Section B; <br /> L-3 Middle sump 794380-208/675659 Certified. <br /> L-5 Supply Transition 794380-208/784715 Certified. <br /> L-6 Vent Transition 794380-208/775641 Certified. <br /> L-7 Pump pan 794380-108/882703 Certified. <br /> L-8 Transition Box 794380-208/907192 Certified. <br /> L-9 Hi level generator(1)9794390-420/950414 Certified. <br /> L-10 Hi level generator(2)794390-420/922325 Certified. <br /> L-11 Generator floor(1)7943780-208/941676 Certified. <br /> L-12 Generator floor(2)794380-208/927249 Certified. <br /> L-13 Secondary pipe(roof)794380-208/927275 Certified. <br /> A mechanical drop tube overfill prevention valve is installed as primary overfill. <br />