Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> Q Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is instsu. ® g 7016 <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. k� M- <br /> C <br /> nF_j <br /> lete the following checklist: <br /> Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> noun <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): ❑X Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD perform an ce?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h;❑0.2 g.p.h. <br /> ❑Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off ifthe LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑N/A fails a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section K below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Suction System. <br />