My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:02:29 AM
Creation date
6/3/2020 9:53:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2004-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. SUBMERSIBLE PUMPONTAINMENT SUMP TESTING(SU N SYSTEM) <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ®Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Uses: EI Pressure p Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Measuring Equipment Used for Testing: Tempsonic <br /> 101 <br /> Sump# Sump# Sump# <br /> r, -- <br /> iameter: 30"epth: 52" <br /> uMaterial: FIBERGLASS <br /> Height from Tank Top to Highest 17" <br /> Piping Penetration: <br /> Height from Tank Top to Lowest 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: CLEAN <br /> Portion of Sump Tested. ABOVE PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects either product N/A <br /> or water? <br /> Turbine shutdown response time. N/A <br /> Is system programmed for fail-safe N/A <br /> shutdown? <br /> Was fail-safe verified to be N/A <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 MINUTES <br /> test: <br /> Test Start Time: 9:38 9:55 <br /> Initial Reading(RI): 2.166 2.167 <br /> Test End Time: 9:53 10:10 <br /> Final Reading(RF): 2.167 2.168 <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): .001 <br /> Pass/Fail Threshold: .002 <br /> Test Result: PASS <br /> Was sensor removed for testing? YES <br /> Was sensor properly replaced after YES <br /> testing? <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained for the repairs) <br /> Note: Hydrostatic testing of sumps should, at a minimum, provide for a liquid level that tests <br /> the tank/saddle juncture and the highest tank piping system projection into the sump. <br /> R.C.U.S.T.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.