My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:02:29 AM
Creation date
6/3/2020 9:53:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2004-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ®Piping Manufacturer ® Industry Standard E]Professional Engineer <br /> ElOther(Specify) <br /> Test Method Uses: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Measuring Equipment Used for Testing: Digital manometer <br /> Piping Run#SUPPLY Piping Run#SUPPLY Piping Run# <br /> Piping Material: PLASTIC PLASTIC <br /> Piping Manufacturer: WESTERN WESTERN <br /> Piping Diameter: '/4 a 1 <br /> Length of Piping Run: 30' 30' <br /> Product Stored: DIESEL DIESEL <br /> Method and location of TEST BOOT TEST BOOT <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 10:40 10:40 <br /> Initial Reading(Rj): 5 PSI 5 PSI <br /> Test End Time: 11:40 11:40 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 1 HOUR 1 HOUR <br /> Change in Reading(RF-Rj): 0 0 <br /> Pass/Fail Threshold: 0 0 <br /> Test Result: PASS PASS <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> ermit was obtained or the repairs) <br /> Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br /> which is generally consistent with testing performed at time of installation. <br /> R.C.U.S.T.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.