Laserfiche WebLink
Pacific Bell: 2600 Camino Ramon,Room 3E000, San Ramon CA 94583 <br /> ROUTINE MONITORING PROCEDURES <br /> Section 2632(d)(1)Title 23 CCR,Chapter 16 <br /> UNDERGROUND FUEL STORAGE TANK <br /> Facility Name: Pacific Bell (UE058) <br /> Facility Address: 10 E. 12TH STREET,TRACY <br /> UST Installed: Double Wall Composite 8,000 Gallons Containing Diesel Fuel for the Emergency <br /> Generator. <br /> Piping Installed: Double Wall "Western Fiberglass" non-metallic flexible piping system for the <br /> product supply and return lines. <br /> A. The Frequency of Performing the Monitoring: <br /> Monitoring is performed continuously on the: <br /> Double wall UST Interstitial space and its two sumps. <br /> B. The methods and equipment used to perform continuous monitoring are: <br /> • VEEDER ROOT UST Monitoring System Model#TLS-350 <br /> • Site fax modem <br /> • GPH magnetostrictive in-tank volumetric probe Model # 847390-107 <br /> • Floating liquid sensors in the: <br /> 1. UST Annular space sensor Model # 794390-420 <br /> 2. Piping sump sensor Model # 794380-352 <br /> 3. Tank Overfill Model # 790091-001 <br /> 4. Fill sump sensor Model# 794380-352 <br /> 1AHAZMAnPACBELL\F0RMS\SBC Monitor Plan2 Merge.doc <br /> Printed: Julv 12, 2001 Daae 2 <br />