Laserfiche WebLink
4 ` <br /> C. Locations where monitoring is performed: (see the plot plan for physical location) <br /> Continuous monitoring and leak detection are performed: <br /> • In the interstitial space of the double wall UST <br /> •i <br /> In the primary tank(by volumetric test) <br /> • In the piping sump <br /> • In the fill sump <br /> D. 1. The Site Manager, KATHY HALLIGAN at 209-474-4514 is responsible for performing: <br /> • Operational monitoring <br /> • On site record keeping,Note: Onsite records are maintained on a board mounted in the <br /> facility. And label "Facility Information Center"and contains the UST Routine Monitoring <br /> &Response Plan, Hazardous Material Business Plan and other environmental records and <br /> permits. <br /> • The reporting of any discrepancies and alarms with the monitoring system, UST, piping, <br /> and associated hardware. <br /> 2. SBC - Environmental Management (California&Nevada region) at(800) 757- 6575 is <br /> responsible for all maintenance and repairs to the UST monitoring system,UST,piping, and all <br /> associated hardware. <br /> E. Reporting format: <br /> A site fax modem with auto-dial for up to 8 phone numbers is installed to fax all alarms <br /> and warnings 24 hours a day to SBC - Environmental Management and to an alarm <br /> monitoring/maintenance company on TLS-350s. <br /> SBC - Environmental Management uses computers with Internal Environmental <br /> Management software program for accessing/polling all facilities with Veeder Root <br /> TLS-350's on a daily basis; of all inventory, alarms, warnings, in tank leak detection, <br /> and sensors leak detection status,performing set up and programming changes, and <br /> system diagnostics with all data being stored. <br /> 1AHAZMAnPAC8ELL\F0RMS\SBC Moniwr Plant Merge.doc <br /> Printed: July 12, 2001 page 3 <br />