My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:02:29 AM
Creation date
6/3/2020 9:53:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2004-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Asphalt, 2" (50mm) minimum thickness, requires 10" (250 mm) minimum cover of the <br /> recommended backfill material. <br /> Unpaved surfaces require a minimum of 20" (300mm) cover of recommended backfill <br /> material. <br /> After pressure testing is complete, care must be taken to insure even distribution and <br /> packing of the backfill material around the piping during the back fill process. Hand <br /> shovel material around and over piping to insure correct spacing is maintained. Backfill <br /> slowly. It is recommended to maintain test pressures during back fill process. See test <br /> section. <br /> Additional care should be taken when initially filling the piping system to insure that all air <br /> is removed from the product piping prior to starting any pumps to prevent damage. Be <br /> certain that the operating pressure of the pumping system does not exceed the maximum <br /> operating pressure of the Co-Flex piping of 75 psi. <br /> Periodic testing of both the primary and secondary sections of the Co-Flex system may be <br /> performed at any time after installation. Periodic testing and/or re-tightening of the Direct <br /> Connection fittings may be performed at any time. <br /> Please see installation instructions for DMA, dispenser mounting assemblies, and Western <br /> Fiberglass, Inc. tank sumps for details on piping penetrations. <br /> MEASURING PIPE RUNS: <br /> Co-Flex piping is available in 250 ft or 1000 ft sections. It may be ordered by the foot if <br /> required. The greatest care is taken after manufacture to package and ship your piping to <br /> insure against damage. Do not drag Co-Flex along the ground, step or place heavy <br /> objects on top of the pipe. . <br /> Cold weather will affect the flexibility and fitting attachment. Leaving the pipe coils in the <br /> sun prior to installation will make them more pliable and easier to handle. In extreme cold <br /> weather, store the piping indoors, at room temperature before measuring, cutting and <br /> terminating. When installing the Direct Connection fittings, sump areas or pipe ends for <br /> termination may be heated prior to attachment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.