My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2004-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 11:02:29 AM
Creation date
6/3/2020 9:53:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2006
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2004-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2). LUBRICATE clamp bolt thread_s and clamp tongue with WD 40 or light machine oil. <br /> Do not lubricate inside of pipe or outside barbed section of termination fittings !. <br /> 3).For 1.5 inch ID Direct Connection fittings, initial band clamp torque set is 12 foot <br /> pounds (144 inch Pounds) For 2.0 inch ID it is 20 foot pounds.(240 inch pounds) <br /> NOTE: Tighten clamp nearest pipe termination fitting first. Prior to testing and after all <br /> clamps have been torqued, re-check all torque settings. Please call Western Fiberglass for <br /> additional or cold weather instructions. <br /> CAUTION; USE ONLY WESTERN FIBERGLASS,INC. APPROVED <br /> TERMINATIONS. <br /> INSTALLING PIPE LENGTHS: <br /> Crossover Supports may be installed over Direct Bury Co-Flex piping to prevent any <br /> chafing where two pipe runs cross. <br /> After test/crossover boots, and if required crossover supports, have been installed and if <br /> used, pipe termination has been swaged on, insert pipe through pipe penetration boots one <br /> side at time. Remove penetration hose clamp or loosen first for ease of installation. If <br /> using the Direct Connection termination fittings, install pipe into penetration first, prior to <br /> clamping of fitting end. <br /> Prepare coupling fitting threads and attach Co-Flex termination fitting (male or female) to <br /> connector/s or Direct Connection fitting and clamps within sump area/s. Tighten to specs. <br /> Position pipe within trench for proper spacing. Lay out piping runs while maintaining <br /> separation between pipe lengths and at crossover points. <br /> TEST & CROSSOVER BOOTfrUBING INSTALLATION: <br /> The Test/Crossover Assembly Boots are attached to the Co-Flex Piping ends to provide a <br /> sealed communication access and test point for the interstitial/secondary space within the <br /> pipe. The Test/Crossover Boots utilizes two (2) stainless steel band clamps which when <br /> tightened around the primary or inner pipe jacket and the Co-Flex containment outer <br /> jacket isolate the interstitial space. <br />
The URL can be used to link to this page
Your browser does not support the video tag.