Laserfiche WebLink
%:1.6 6LZ0 bbZ SE6 9 T:S T b00Z-02—NOW <br /> Site Address: 10 E. 12TH STREET,TRACY Date of Testing/Servicing: 8/11/03 <br /> F. In-Tank Gauging/SIR Equipment: S Check this box if tank gauging is used only for inventory <br /> control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the follo ing checklist: <br /> S Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> S Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> S Yes ❑ No* Was accuracy of system product level readings tested? <br /> S Yes ❑ No* Was accuracy of system water level readings tested? <br /> S Yes ❑ No* Were all probes reinstalled properly? <br /> S Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Dine beak Detectors (LLD): ® Check this box if LLDs are not installed. <br /> Com lete the follo ine checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> [IN/A (Check all that apply) Simulated leak rate: El3 g.p.h.1; p 0.1 g.p.h.2; El0.2 g.p.h z <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> ❑ Yes ❑ No* Were all LLDs confu-med operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> V00[B SSOIAHHS MHOA. HN 6LZ0 66Z SZ6 XVS 90:9T SILL 60/0£/£0 <br />